Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 14, 2022     33-8 Baggage Area step 1-7 - (3 hours) Category: Fuselage
Clecoed all the floor panels, side panels, door close out and seal channels to the F-1006 Bulkhead and to the longerons.
Matchdrilled the right side panel F-1080 into the floor panels, into the F-1006 Bulkhead and into the fuselage longerons. Clecoed the corrugated panel and matchdrilled into the F-1006 Bulkhead with #19 drill.
 